Company report
Summary of Results
While absolute results remain low overall, AngloGold Ashanti shows one of the three stronger results in Economic Development, Lifecycle Management and Community Wellbeing. The company also shows one of the five stronger results in Environmental Responsibility. For the other two thematic areas, Business Conduct and Working Conditions, AngloGold Ashanti’s results are above the average achieved across all 38 companies.
AngloGold Ashanti ranks 4th out of the 38 companies on its mine-site-level results, though with an average score of only 20% in the mine-site assessment.
AngloGold Ashanti’s relatively stronger results in the company-wide assessment reflect its establishment not only of formalised commitments but also company-wide systems on a range of issues. For example, in Economic Development, the company has corporate-level guidelines for partnering with sub-national producing country governments on socio-economic development planning. In Lifecycle Management, AngloGold Ashanti has systematic measures to hold board directors and senior managers accountable for responsible business conduct on ESG issues. In Community Wellbeing, the company has systems designed to ensure its operations engage with local communities and artisanal and small-scale miners, and avoid, minimise and mitigate the impacts of physical or economic displacement.
Compared to the other companies, AngloGold Ashanti accounts for one of the stronger results on its transparency about severe negative impacts linked to its operations. For example, the company publicly reports on community fatalities and injuries, and environmental incidents.
The company shows evidence of continuous improvement in several areas since the RMI Report 2018, most notably in formalising its corporate approach to supporting local procurement and local business development. In addition, AngloGold Ashanti is associated with several leading practices, including for example a comprehensive approach to mitigating the impacts of collective retrenchment, and relatively detailed disclosure of its environmental incidents.
On the other hand, the company’s overall results are limited by a lack of evidence on some issues, such as collaborative R&D on socio-economic and environmental issues related to mining, technical and managerial skills development of its local workforces, and tracking and reviewing the quality of its relationships with affected communities.
Moreover, AngloGold Ashanti’s results in the mine-site-level assessment reveal that none of its four assessed mine sites show any evidence of informing or engaging with affected communities in their post-closure planning. Likewise, none of these sites show evidence of having an operational-level grievance mechanism for their workers.
Overall results
Results per measurement area
Commitment
(9 indicators)Action
(42 indicators)Effectiveness
(20 indicators)Results per indicator
Economic Development
A.01 National and Supranational Socio-Economic Development Planning
A.02 National and Supranational Procurement
A.03 Collaborative Research and Development
A.04 Enhancing the National Skills Base
Mine-site Results
Mine sites selected for individual assessment (but not included in the overall company score)
Cuiabá Complex | Geita | Iduapriem | Siguiri | |
---|---|---|---|---|
Local Employment (score /3) | 1.0 | 0.0 | 1.5 | 0.0 |
Local Procurement (score /3) | 0.0 | 1.0 | 1.0 | 0.5 |
Post-Closure Plans (score /3) | 0.0 | 0.0 | 0.0 | 0.0 |
Community Grievances (score /3) | 1.0 | 0.5 | 1.0 | 0.5 |
Worker Grievances (score /3) | 0.0 | 0.0 | 0.0 | 0.0 |
Air Quality (score /3) | 0.0 | 1.5 | 1.5 | 0.0 |
Water Quality (score /3) | 0.0 | 1.0 | 2.0 | 1.0 |
Water Quantity (score /3) | 0.0 | 0.5 | 0.5 | 0.5 |
Tailings Management (score /3) | 2.0 | 1.0 | 1.0 | 1.0 |
Emergency Preparedness (score /3) | 1.5 | 1.0 | 0.0 | 0.5 |
Mine-site Score (%) | 18.3 | 21.7 | 28.3 | 13.3 |
Operational mine sites
Mine Site Name | Aliases | Country | Company's share (%) | Products | Mining types |
---|---|---|---|---|---|
Cerro Vanguardia | - | Argentina | 92.5 | Gold | Open-pit, Underground |
Cuiabá Complex | Cuiabá, Lamego, AGA Mineração | Brazil | 100 | Gold | Open-pit, Underground |
Córrego do Sítio | CdS I, São Bento, CdS II, Carvoaria, Laranjeiras, Cachorro Bravo, Rosalino | Brazil | 100 | Gold | Open-pit, Underground |
Geita | - | Tanzania | 100 | Gold | Open-pit |
Iduapriem | Teberebie | Ghana | 100 | Gold | Open-pit |
Kibali | - | DRC | 45 | Gold | Open-pit, Underground |
Kopanang | - | South Africa | 100 | Gold | Underground |
Moab Khotsong | - | South Africa | 100 | Gold | Underground |
Morila | - | Mali | 40 | Gold | Open-pit, Underground, Tailings Leach |
Mponeng | - | South Africa | 100 | Gold | Underground |
Serra Grande | Mina III, Mina Nova, Pequizão | Brazil | 100 | Gold | Open-pit, Underground |
Siguiri | - | Guinea | 85 | Gold | Open-pit |
Sunrise Dam | - | Australia | 100 | Gold | Open-pit, Underground |
Surface Operations | Mine Waste Solutions, Chemwes, First Uranium SA | South Africa | 100 | Gold, Uranium Oxide | Tailings Leach |
Tropicana | - | Australia | 70 | Gold | Open-pit |
Closed mine sites (known)
(controlled assets under care & maintenance, closure or post-closure management)
Mine Site Name | Aliases | Country | Company's share (%) | Products | Mining types | Year of closure |
---|---|---|---|---|---|---|
Nova Lima Sul | Raposos, Morro da Glória | Brazil | 100 | Gold | Underground | 2000 |
Obuasi | - | Ghana | 100 | Gold | Open-pit, Underground | 2016 |
Sadiola | - | Mali | 41 | Gold | Open-pit | 2018 |
TauTona | - | South Africa | 100 | Gold | Underground | 2017 |
Yatela | - | Mali | 40 | Gold | Open-pit | 2013 |
Tailings (known)
Name | Country | Status | Construction Method | Impact-based hazard category (company-reported) |
---|---|---|---|---|
Cerro Vanguardia, CVSA TSF | Argentina | Active | Downstream | High / High C |
Corrego do Sitio, CDS 1 TSF | Brazil | Active | Downstream | High |
Corrego do Sitio, CdS II TSF | Brazil | Active | Centreline | High |
Cuiaba TSF | Brazil | Active | Downstream | High |
Cuiaba, Open Pit | Brazil | Active | Upstream | High |
Geita Old TSF | Tanzania | Inactive | Upstream | High |
Geita TSF | Tanzania | Active | Upstream | High |
Iduapriem, Block 1 Pit | Ghana | Inactive | N/A | N/A |
Iduapriem, Block 2 Pit | Ghana | Inactive | N/A | N/A |
Iduapriem, GTSF | Ghana | Active | Upstream | High |
Iduapriem, I TSF | Ghana | Inactive | Upstream | High |
Kibali, CTSF 1 | DRC | Active | Downstream | High |
Kibali, CTSF 2 | DRC | Active | Downstream | High |
Kibali, FTSF | DRC | Active | Downstream | High |
Mina Serra Grande, MSG TSF | Brazil | Active | Upstream | High |
Mine Waste Solutions, Buffelsfontein 1 | South Africa | Inactive | Upstream | High |
Mine Waste Solutions, Buffelsfontein 5 | South Africa | Inactive | Upstream | High |
Mine Waste Solutions, East Complex | South Africa | Reclamation | Upstream | High |
Mine Waste Solutions, Hartebeesfontein 1 & 2 | South Africa | Reclamation | Upstream | High |
Mine Waste Solutions, Hartebeesfontein 5 & 6 | South Africa | Inactive | Upstream | High |
Mine Waste Solutions, Kareerand | South Africa | Active | Upstream | High |
Mine Waste Solutions, MWS (Chemwes) 4 | South Africa | Inactive | Upstream | High |
Mine Waste Solutions, MWS (Chemwes) 5 | South Africa | Inactive | Upstream | High |
Mine Waste Solutions, Southeast | South Africa | Reclamation | Upstream | High |
Mine Waste Solutions, Sulphur Pay Dam | South Africa | Reclamation | Upstream | High |
Morila TSF | Mali | Reclamation | N/A | Low |
Obuasi, Kokotesua TSF | Ghana | Inactive | Upstream | High |
Obuasi, Pompora TSF | Ghana | Inactive | Upstream | High |
Obuasi, STSF | Ghana | Inactive | Upstream | High |
Queiroz, Calcine TSF | Brazil | Active | Downstream | High |
Queiroz, Cocoruto TSF | Brazil | Active | Downstream | High |
Queiroz, Rapaunha TSF | Brazil | Active | Downstream | High |
Sadiola TSF | Mali | Active | Upstream | High |
Siguiri TSF | Guinea | Active | Upstream & Downstream | High |
Sunrise Dam, CTD TSF | Australia | Active | Central Thickened Discharge | Low |
Sunrise Dam, TSF 1 | Australia | Inactive | Upstream | Low |
Tropicana TSF | Australia | Active | Downstream | High C |
Vaal River Operations, West Complex | South Africa | Inactive / Active | Upstream | High |
Vaal River Operations, West Extension | South Africa | Active | Upstream | High |
West Wits Operations, Mponeng TSF | South Africa | Active | Upstream | High |
West Wits Operations, Savuka New Complex | South Africa | Active | Upstream | High |
West Wits Operations, Savuka Old Complex | South Africa | Inactive / Active | Upstream | High |